The owners choice in Roofing and Restoration

Project Graphic
  • Pavilion on the Park

    This project was a full roof replacement completed in 2010. KGS removed the existing roof system composed of built up roofing overlaid with foam and installed an adhered ¼” per foot tapered insulation system with a primed dens deck cover board. We than installed a two ply modified bitumen...

    more info »
  • Pan Am Shopping Center

    KGS was contracted by Federal Realty Investment Trust to replace a section of roof over multiple retail tenant spaces.

    more info »
  • Sterling Business Park

    KGS was contracted by First Potomac Management in 2009 to install a new roof over half of the building and then again in 2010 to install a new roof over the second half of the building. This roof project included...

    more info »
  • Plaza 500

    KGS was contracted by First Potomac Management to replace a 40,000 SF section of roof over multiple tenant spaces. The project involved the removal of two existing roof systems down to the metal deck and the...

    more info »
  • Champlain Medical Building

    KGS was contracted by Vornado to replace the roof. The old membrane was removed and a new tow ply modified bitumen roof system was applied. KGS also replaced the sealant joints in the precast walls of...

    more info »
  • Gari Melcher Complex

    KGS was contracted by Stafford County School District to replace the roof on this building. The project consisted of complete removal of the existing roof system on the flat and sloped portions of the building and the installation of new tapered...

    more info »
  • Winchester Fulton

    KGS performed a full roof replacement on this building consisting of a new two ply modified bitumen Irma roof system, a roof top patio constructed with concrete pavers set on pedestals and installed a new...

    more info »
  • 1010 N. Glebe

    KGS was contracted by Cassidy Turley to replace the roof on this building in 2010. The project involved moving existing ballast, adding a new layer of insulation and installing .060 EPDM membrane system.

    more info »
  • Water Environmental Federation

    KGS worked together with a landscape company on this project to install a green roof. The job was performed in Alexandria and involved the installation of two ply modified bitumen membrane, protective matts, pavers,...

    more info »